Production Scheduling

InfoPlan

From order confirmation to the production floor — APS (Advanced Planning and Scheduling) software that reduces lead times and maximises plant efficiency.

Request a Demo Part of Tangram Suite
InfoPlan logo
What It Does

Plan Smarter.
Produce Faster.

InfoPlan is INFORMA's core production scheduling module, designed to handle the full complexity of industrial planning — from customer order entry right through to machine assignment and shop floor execution.

Whether you manage a single production line or a multi-machine plant, InfoPlan provides the visibility and control to meet delivery commitments while minimising costs.

Order-Driven Scheduling

Automatically generates production sequences from customer orders, respecting priorities, due dates and material availability.

Machine & Resource Optimisation

Assigns jobs to the best-fit machines based on capability, availability and changeover costs to maximise OEE (Overall Equipment Effectiveness).

What-If Simulation

Test different planning scenarios — rush orders, machine downtime, new constraints — before committing to the schedule.

ERP (Enterprise Resource Planning) & MES (Manufacturing Execution System) Integration

Connects bi-directionally with your ERP, MES and TMS (Transport Management System) to keep planning, execution and transport always in sync.

Inside the Software

See It in Action

InfoPlan Master Plan Gantt chart by extrusion line
Master Plan — Gantt by Extrusion Line
InfoPlan Coating Plan — Gantt board with order grid
Coating Plan — Gantt & Order Grid
InfoPlan Slitting Plan — Gantt board with order grid
Slitting Plan — Gantt by Slitter Line
Also in the Suite

Works Best With

Filtro
Slitting optimiser — minimise scrap, maximise yield
InfoMex
Lean web-based MES for film and coil production
Reel Manager
MES for real-time shop floor tracking
InfoTrasp
TMS (Transport Management System) — transport planning
InfoContainer
Load optimisation for containers and trucks

See InfoPlan Live

Book a demo and watch a typical flow through the software.

Request a DemoTangram Suite